How to write a renovation quote step by step

8 min read · Updated 9 November 2026 · By the PRESULINK team, Mollina (Málaga, Spain)

A well-written renovation quote gets signed more often and argued about less. This guide walks through the whole process, from the site visit to the signature, with the items that cannot be missing and the mistakes that cost the most money.

← Home

What a renovation quote is (and what it is not)

A renovation quote is the document where you state what you will do, with which materials, in how long and for how much. It is not a spoken estimate or a figure sent over WhatsApp: it is the basis of the contract and what the client will compare against two or three other quotes.

So it has to do three things at once: be understandable to someone outside the trade, protect you when something hidden turns up, and make clear what is included and what is not. Everything else (design, logo, colours) helps, but does not replace that.

Step 1 · The site visit: measure and ask before writing a number

Most quotes that go wrong go wrong during the visit. Bring a laser measure, photograph everything and ask what the client takes for granted:

  • Real measurements of floors, walls and ceilings in every room, including door and window openings.
  • Condition of the installations: age of plumbing and wiring, certificates, where the drains run.
  • Site access: lift, floor, distance to the skip, building rules on working hours.
  • What exactly they want: "redo the bathroom" can mean swapping the fittings or knocking down walls. Let them say it.
  • Who buys the materials: you, the client or a mix. It changes both the price and the responsibility.

If you quote remotely, an online self-service quote does this work for you: the client answers the questions from their phone and you receive the measurements and answers before the visit.

Step 2 · Split the job into chapters and items

A professional quote is organised in chapters (demolition, masonry, plumbing, electrics, tiling and flooring, joinery, painting, cleaning) and, within each chapter, in line items: one line per task with its unit, quantity, unit price and amount.

The usual units are the square metre (floors, tiling, painting), the linear metre (skirting, pipework), the unit (light points, sanitaryware, doors) and the lump sum for what cannot be measured (transport, skip, final clean). Mixing units or leaving items "by eye" is the main cause of arguments at the end of the job.

Renovation quote example: chapter for a 5 m² bathroom

ItemUnitQtyPriceAmount
Removal of existing wall and floor tiles, taken to skipm²22€14€308
Wall tiling with 30×60 porcelain, cement adhesivem²17€38€646
Anti-slip porcelain floor tilingm²5€42€210
New water and waste point (basin, WC, shower)unit3€95€285
3 m³ rubble skiplump1€180€180
Subtotal€1,629
VAT 10% (home over two years old, materials under 40%)€162.90
Total€1,791.90

The prices are indicative: what matters is the structure. With a well-built price list of your own, 80% of the items in your renovations repeat and only the quantities change.

Step 3 · Set the price: cost, margin and contingencies

Each item's price has to cover labour (real hours, not the ones you would like), materials (with waste: 8 to 12% on tiling), site resources (scaffold, skip, tools) and overheads (van, insurance, social security, the time spent writing this quote). Your margin goes on top of all that.

A common mistake is to add the margin only at the end, as a percentage of the total. If the client then removes two items, the margin goes with them. Spread it across the unit prices and the quote survives the changes.

And keep a line or a clause for contingencies: what appears when you open things up (damp, lead pipes, hidden false ceilings). If you do not write it down, you end up paying for it.

Step 4 · What the document cannot be missing

  • Your details and the client's: name or company name, tax ID, site address, phone and email.
  • Number, date and validity: material prices change; 15 or 30 days is normal.
  • Chapters and items with unit, quantity, price and amount, and a subtotal per chapter.
  • What is included and what is not: materials or not, grades, permits, skip fees, other trades' work.
  • Lead time and an indicative start date.
  • Payment terms: percentage on signing, stage payments per chapter, balance on completion.
  • VAT: itemised. In Spain, most renovations of a private home over two years old are at 10% if materials are under 40% of the total, otherwise 21%. Say so in the quote.
  • Terms: contingencies, client changes, guarantee and who handles waste.
  • Signature of both parties. A signed quote is a contract.

Step 5 · Deliver it well and follow up

The best quote is useless if it arrives late or as a blurry photo. Send it as a PDF, with your branding, the same day as the visit or the next, with two lines recalling what you discussed. Three or four days later, a short call: "any questions?". Half of the quotes that are lost are lost for not asking.

When the client accepts, turn it into a contract and ask for the signature. With renovation quoting software like PRESULINK the quote becomes a contract signed from the phone without rewriting it, and the schedule keeps the visit and the start date.

The five mistakes that cost the most

  1. Quoting without measuring. 10% extra square metres of tiling is hundreds of euros you pay.
  2. Not saying what is excluded. For the client, "painting" includes the ceiling, the doors and filling the holes.
  3. Forgetting waste and site resources. Skip, fees and scaffold can be 5% of the total.
  4. No validity date. A six-month-old quote with the material prices of back then.
  5. A different spreadsheet every time. Prices that no longer match between quotes, broken formulas and lost hours. Better a price list of your own that you reuse, as the guide on quoting without Excel explains.

Checklist before sending

  • Measurements taken on site, not estimated.
  • Every item with unit, quantity and price.
  • Materials with grade and who buys them.
  • Contingencies, waste and site resources covered.
  • Lead time, payment terms, VAT and validity written down.
  • PDF with your branding and contact details.
  • Reminder set to call in three days.

If you want a ready-made structure, the guide to the renovation quote template has the full skeleton with every section.

How to do it in PRESULINK, step by step with screenshots: First quote and Free-form quote.

Frequently asked questions

How long does it take to write a renovation quote?

One to three hours if you start from scratch in a spreadsheet. With a price list of your own and software that reuses the items, a bathroom or a kitchen takes 10 to 15 minutes from your phone.

Should you charge for a renovation quote?

For small jobs the visit and the quote are usually free. For full renovations or long surveys, many professionals charge for the technical visit and deduct it if the client goes ahead.

Which VAT rate applies to a renovation in Spain?

10% if the property is a private home over two years old and the materials supplied by the professional are under 40% of the taxable base. Otherwise, 21%. It is the professional who must apply it correctly, so it is worth writing it in the quote.

Is a signed quote a contract?

Yes. A quote accepted and signed by both parties is binding like a contract. That is why it should carry terms, lead time and payment conditions, not just the amounts.

Can I write the quote from my phone?

Yes. PRESULINK is designed for doing it during the visit: pick items from your price list, enter the measurements and the branded PDF is ready. The free plan is enough to start; PRO costs €15.50 a month plus VAT, with a 14-day trial and no card.

Write your next quote in 10 minutes

With your price list, your chapters and your branding. Free to start, no card.

Start for free